The kitchen and the family have outgrown each other
- Usually points to
- An extension, or moving walls inside the footprint you already have. Both start with drawings. The second often needs no planning application at all.
Service · Building work
The kitchen’s been too small since the second child arrived. Or the wall between two rooms has always felt like it was in the wrong place. Building work starts with what you want to change and what the house will let you do.
TOWIE Builders works from Reigate and takes enquiries from across Surrey. Still at the permissions stage? The planning guide is a good first read.
01What you’re seeing
Most building enquiries start with something you’ve noticed, not a job title. Here’s what a few of the common ones usually point to.
02Why it matters
Changes are cheapest on paper. Moving a doorway on a drawing costs an eraser. Moving it after the steel’s in costs a day, a skip and a conversation nobody enjoys.
Paperwork matters later too. Extensions, knock-throughs and loft rooms without a completion certificate tend to surface when you sell, usually at the worst possible moment in the chain.
And you’re probably living there. A job that’s planned properly has a start, a middle and an end, rather than a kitchen that’s been in the garage since spring.
Every decision made before the first trench is one that can’t go wrong on site.
Signed-off work is one less question from a buyer’s solicitor.
Ordering, inspections and trades in the right sequence keep the end in sight.
03Why a builder
Plenty of jobs around the house are fair game for a weekend. Structural work isn’t one of them, and the reasons are practical rather than snobbish.
Anything that touches the structure, the drains or the outside walls normally needs building regulations approval, with inspections at set stages. Getting those booked, passed and signed off is part of the job, and so is knowing what an inspector will want to see before the plasterboard goes up.
Then there’s the house next door. Work to a shared wall can bring in the Party Wall Act, with notice periods of one or two months. And your home insurer will usually want to know about major works before they start, not after a claim.
04Our process
Four stages, in this order, whatever the size of the job.
What you want changed, the postcode, any drawings, and when you’d like it done. Photos on WhatsApp help.
Nothing gets priced properly from a description alone. Access, the ground and the existing structure all show up on a visit.
Planning if it’s needed, building regulations either way, and party wall notices where a shared wall is involved.
Work in sequence, inspections booked at each stage, and the completion certificate at the end for you to keep.
05Aftercare
New work takes a while to settle, and most of what people worry about in the first few months is normal.
Fresh plaster can take several weeks to dry out fully. Paint it too soon, or with the wrong paint, and it peels. A thinned mist coat goes on first.
New timber and plaster shrink a little as the heating goes on for the first winter. Fine cracks along joints are common and get filled at the first redecoration.
A new extension holds a lot of water from the build. Open the trickle vents and run the extractor fans while it dries.
Completion certificate, electrical certificate, any warranties on windows or roof. Keep them together with the deeds.
06Homes and businesses
Most people live in while the work goes on, so the useful questions are practical ones. Which room is out of action and for how long? Where does the kitchen go while the old one comes out? Is there a way in that doesn’t go through the hallway?
Say who lives there in your enquiry: young children, someone working from home, a dog that doesn’t like strangers. It changes how the job is organised.
A shop, office or workshop brings different questions. Does the landlord need to consent? Can the work happen while you keep trading, or out of hours? Fire safety law covers most commercial premises, so building regulations go through the full plans route, not a building notice.
Mention the use of the building and your opening hours when you get in touch.
07Cost
Nobody can give a fair price for building work without seeing the property, and a figure off the internet won’t match your house. What follows is what moves the number.
To talk through your own job, call 07904 404159.
Floor area matters, but so does shape. A plain rectangle costs less per square metre than one with corners, roof lights and a vaulted ceiling.
Clay soils near trees often need deeper foundations. A building control inspector decides on the depth when the trench is open.
No side or rear access means every bag, block and bucket of spoil goes through the house. That takes time.
An older house can hide surprises: missing lintels, old repairs, chimney breasts removed without support. Allowing for them is better than pretending they won’t appear.
Matching old brick, choosing bifold doors over a window, or tiling floor to ceiling all change the figure.
Architect or designer, structural engineer, building control, and party wall surveyors where they’re needed.
Talk to us
Call us, or send photos and a postcode on WhatsApp.
08Where
Reigate building work is shaped by the town’s age and its slopes. Near the High Street and the station, houses tend to be Victorian or Edwardian, with solid walls, timber floors and the odd chimney breast that came out without the right support years ago. Further up towards Reigate Hill, gardens rise and fall, which changes how foundations and access are planned.
Parts of the old town are conservation areas, so anything visible from the street gets a closer look from the council. Builders in Reigate covers the town in more detail.
Across the rest of Surrey, each borough and district has its own planning team and its own way of reading the same national rules. Much of the county is Green Belt, and a lot of it sits on clay that moves as it wets and dries, which is why foundation depths change from one street to the next.
If your property is outside Reigate, put the postcode in your enquiry. Builders in Surrey explains what changes from one council to the next.
09On site
The first morning of a building job sets the tone. Here’s what usually happens, so none of it is a surprise.
A skip or grab lorry for spoil, and somewhere agreed for deliveries. If either sits on the road, the licence comes from Surrey County Council.
Floors and stairs covered, furniture moved out of the way, and dust sheeting or zip doors between the work and the rooms you’re still using.
Anything at height, from a roof to a gable, needs proper access up first.
A word with the neighbours about noise, parking and the skip goes a long way, especially on a terrace.
10Worth knowing
Opening two rooms into one is one of the most common building jobs there is, and one of the easiest to get wrong. A lot of internal walls carry weight: floor joists, the wall above, sometimes part of the roof. In a Victorian terrace the middle “spine” wall often does all three.
Knocking a hole and dropping in a lintel by eye might hold for a while. Then the ceiling above cracks, doors upstairs start to stick, and the steel that should have gone in at the start goes in anyway, with the plaster and decorating done twice. Without calculations and an inspection, there’s no completion certificate either.
11Before you call: guides
If you think you need building work but aren’t sure where to begin, these are the three questions to settle. Each guide takes about five minutes.
What permitted development covers in Reigate, and the streets where it doesn’t.
Two separate approvals that answer two separate questions. Most jobs need at least one.
The letter to send next door before a steel goes into the shared wall.
12FAQs
Send us a description of the work, the postcode and any drawings or photos, by the form, phone or WhatsApp. Building work needs to be seen before it can be priced properly, so expect a visit before a figure.
If you have them, send them with your enquiry. If you don’t, say what you’d like to achieve and that can be talked through first.
Usually, for most extensions and internal changes. Some stages, like a kitchen being moved or the electrics being off, are harder to live through than others, and it helps to plan around them.
It has to be appointed before work starts, either the council or a registered approver. Agree who is booking it and the inspections before the job begins. The building regulations guide explains the routes.
That depends on the size of the job, the weather for anything outside, and material lead times. Permissions can add weeks or months before work begins. A clear brief makes it easier to give a realistic programme.
Older houses especially can hide old repairs or missing supports. When it happens, the sensible order is to stop, look at what’s been found together, and agree the fix and any extra cost before carrying on.
Usually, yes. Most policies ask to be told about major work before it starts. Check your policy wording or ring them.
It depends on the job. Our sister company is TOWIE Scaffolding, so ask about access when you enquire.
Enquiries come from across Surrey. Put the property’s postcode in the form so the location can be checked.
If it involves a shared wall, a new wall on the boundary, or digging near next door’s foundations, probably. The party wall guide has the detail.
13Get in touch
A few lines about the job and a postcode is all it takes to start. Use the form, ring, or send photos on WhatsApp, whichever is easier.
Sister company of TOWIE Scaffolding, a Reigate firm since 2016. One team, one phone number.