Two approvals, two different questions
Planning asks whether something should be built at all: how it looks, how it affects the neighbours, how the land is used. The council’s planning department decides.
Building regulations ask whether it’s built safely and to a standard: structure, fire safety, insulation, ventilation, drainage, stairs, electrics. The rules are set out in the Approved Documents, a set of government guides lettered A for structure through to the newer ones on overheating and electric vehicle charging.
Jobs that need building regs but not planning
These are the ones that catch people out, because nothing changes outside.
- Taking out or altering a load-bearing wall. The steel and its supports need calculations and an inspection.
- Converting an integral garage into a room.
- A loft conversion built under permitted development.
- Widening a window or door opening, which needs a new lintel.
- New drainage for a bathroom or kitchen moved to another room.
- Most electrical work in kitchens and bathrooms, and any new circuit.
Jobs that can need planning but not building regs
It works the other way too. Some jobs are exempt from building regulations but still need planning in the wrong place.
- A ground-floor conservatory under 30 square metres, separated from the house by external doors and with its own heating, is usually exempt from building regulations. In a conservation area it may still need planning.
- A small detached outbuilding under 15 square metres with no sleeping space is usually exempt from building regulations.
- A wall or fence over 2m high, or over 1m next to a road, needs planning but not building control.
Who signs off building regulations
You choose. Either the council’s building control service, or a registered building control approver, the private firms that were called approved inspectors until the rules changed in 2024. Both inspect the work as it goes and issue the final certificate.
Whoever you pick, they need to be appointed before work starts. Bringing them in halfway through is possible but slower, and they may ask to see things already covered up.
Full plans or building notice
With council building control there are two routes. A full plans application means the drawings are checked and approved before anyone starts, which is the safer route for anything structural or large. The council has five weeks to decide, or two months if you agree to it.
A building notice skips the plan check. Work can start two days after the notice goes in, and the inspector checks it on site. It suits small, simple jobs. It can’t be used for work to shops, offices and other premises covered by fire safety law, or for building close to a public sewer.
What gets inspected during the job
Inspections happen at stages where the work is about to be covered up. Typically the foundation trench before concrete goes in, the damp-proof course, drainage before it’s backfilled, structural steel before it’s boxed in, insulation, and a final visit at the end. Someone needs to book each one in good time, because missing a stage can mean digging or opening something back up.
Keep the completion certificate
When the final inspection passes, you get a completion certificate. File it with the deeds. A buyer’s solicitor will ask for it, often years later, and without one a sale can stall.
If work was done without approval, the council can consider a regularisation application. That’s retrospective and can mean exposing foundations, steels or insulation so an inspector can see them. It’s a lot cheaper to get the sign-off at the time.
Electrics, gas and windows: self-certified trades
Some trades can sign off their own work through a competent person scheme. A registered electrician notifies electrical work, a Gas Safe engineer registers a new boiler, and a FENSA or CERTASS installer covers replacement windows. You get a certificate in the post. Check the installer’s registration before the work, not after. For the structural side of a job, the building work page explains how it runs.